One contract, one process

Six steps from your FF&E schedule to a furnished hotel.

How we deliver

Our delivery process

  1. Brand standard review
    01

    Brand standard review

    Design standard, concept and FF&E schedule.

  2. Shop drawings & material boards
    02

    Shop drawings & material boards

    Drawings, finishes and samples for sign-off.

  3. Mock-up room
    03

    Mock-up room

    One complete room, approved before production.

  4. Production & quality control
    04

    Production & quality control

    Inspected against the approved mock-up.

  5. Packed by room number
    05

    Packed by room number

    Labelled by room, shipped in phases.

  6. Installation & handover
    06

    Installation & handover

    Installed, checked and handed over.

A project manager from day one

No signed sample, no production

Built to your project’s codes

After-sales support from Ho Chi Minh City

Included in our scope

  • FF&E schedule review and value engineering
  • Shop drawings and material samples
  • Mock-up room before mass production
  • Production, quality inspection and protective packing
  • Export documents and consolidated shipping
  • Delivery scheduling and installation supervision
  • Spare parts and after-sales service

Outside our scope

  • Interior design concept (we work from your designer’s drawings)
  • Building works, MEP and fixed finishes
  • Local permits and site management
  • OS&E consumables such as linen and amenities, unless listed in the contract