Process
One contract, one process
Six steps from your FF&E schedule to a furnished hotel.
How we deliver
Our delivery process
- 01
Brand standard review
Design standard, concept and FF&E schedule.
02Shop drawings & material boards
Drawings, finishes and samples for sign-off.
03Mock-up room
One complete room, approved before production.
04Production & quality control
Inspected against the approved mock-up.
- 05
Packed by room number
Labelled by room, shipped in phases.
06Installation & handover
Installed, checked and handed over.
A project manager from day one
No signed sample, no production
Built to your project’s codes
After-sales support from Ho Chi Minh City
Included in our scope
- FF&E schedule review and value engineering
- Shop drawings and material samples
- Mock-up room before mass production
- Production, quality inspection and protective packing
- Export documents and consolidated shipping
- Delivery scheduling and installation supervision
- Spare parts and after-sales service
Outside our scope
- Interior design concept (we work from your designer’s drawings)
- Building works, MEP and fixed finishes
- Local permits and site management
- OS&E consumables such as linen and amenities, unless listed in the contract
Request a Quote
Planning a hotel opening or renovation?
Send us your brand standards, drawings or FF&E schedule. We will prepare a room-by-room proposal and a mock-up plan.